Red Stick
Member
I have an existing 16,000 sf building, VA construction, 'M' use group. The owner wants to add an 8,000 sf steel frame addition with sprinkler (addition will have upholstered furniture) I have 30' perimeter clearance, but how do I handle the allowable increase with partial sprinkler? Also, can I assume the lower value for allowable area from Table 508, type III?
This is in Michigan, using the 2012 Code
Thanks
This is in Michigan, using the 2012 Code
Thanks