I was the PM for a project in Portland, the permit fees were a bit high but not unresaonable. The nice thing was, once we started the process the city assigned one person to the project, and he did everything from initial plan review all the way to final inspection.FYI: All Inspections are paid 100% by permit fees in Oregon. Not taxes.![]()
In Conarb's world permit fees start at $5000 for a bathroom remodel and require signoffs from 3 different engineers plus another 2 architects with 3D drawings and moving a sink in a kitchen requires a approval by the governor of California along with a $50,000 fee to DEP for in impact analysis to the sewer system. The permit would take 5 years for approval and during construction everyone's property taxes would be raised $10,000 per year to cover the costs of the building department. This, along with the fact that a $1,000,000 permit fee for a new single family residence with a value of $275,000 being the norm makes his world only for the elite.
Part of the concrete block had to be removed to clear the cover.
h"
Chimney.Back to the meter thats way too close to the wall ... why does the contractor havd to ask edison to put it in a compliant lication? Why would edison think its ok to put it in a non compliant location? Seems like negligence on their part. But the electrician should have had enough sense to not install it there.
On the handrail ... whats the shiny pipe in the first picture?
Good point...post 3165. ICE wouldn't that wall also be a rated wall due to distance to property line?