It's something I really need to consider.FYI-Editing is a feature that you get when you pay to become a sawhorse. Just sayin......![]()
I doubt that Edison would have a problem with this. The picture came from another inspector. We both got a good laugh out of it. He said that the contractor was a no show. He plans on meeting the contractor and asking him to open up the old enclosure.So Cal Edison I doubt will be amused, and I hope you were not either.![]()
How does the contractor propose to secure the old meter opening? Hopefully something better than a piece of cardboard.
We require a metal meter blank. Some inspectors will not allow any panel enclosure to be converted to a junction box. I am mostly okay with the conversion if the existing enclosure is surface mounted and can drain water. This setup is a lot of work to be so completely wrong.How does the contractor propose to secure the old meter opening? Hopefully something better than a piece of cardboard.
Looks like it. There is a label on each side that you can zoom in and read, mentions putting the building paper over the flange.So is that panel made with tabs to install in the stucco ?![]()
![]()
So is that panel made with tabs to install in the stucco ?![]()
![]()
Most of the work in ICE's neighborhood is "full flush"....It's a semi-flush mount panel, so yes