We are building a new 1-hour rated wall from floor to deck, however directly above is a large sanitary Main pipe that essentially runs parallel to the new wall, the new wall must either (in section view) jog to the left 90 degrees and go straight up or be angled to avoid the pipe above ceiling then go straight up to deck. Is there any known standard for this situation, considering it has a 1-hour rating?