Greetings all,
I am hearing of a possilbe project coming up. An existing F1 of about 4000 sq/ft. What is proposed is atop the F1 putting several R2 apartments. R2 has to have sprinklers for sure. What about separation? Going to T508.3.3 it states that 2 hour separation is required between the F1 and R2 if the the building in nonsprinklered. I am assuming this will apply unless they want to go back and sprinkler the F1(even thoughi it's existing) as well which would mean the entire building would be sprinklered. Therefore if the whole building is sprinklered, only a 1 hour separation would be required. Am I assessing this correctly?
There is also a possilbility that the entire building might exceed the area limitations of T503. I don't know for sure. If the entire project exceeds the allowable 9500 sq/ft for VB, they will have to sprinkler the whole place anyway to allow for the increased size of a mixed use occupancy. Right?
thanks folks
BS
I am hearing of a possilbe project coming up. An existing F1 of about 4000 sq/ft. What is proposed is atop the F1 putting several R2 apartments. R2 has to have sprinklers for sure. What about separation? Going to T508.3.3 it states that 2 hour separation is required between the F1 and R2 if the the building in nonsprinklered. I am assuming this will apply unless they want to go back and sprinkler the F1(even thoughi it's existing) as well which would mean the entire building would be sprinklered. Therefore if the whole building is sprinklered, only a 1 hour separation would be required. Am I assessing this correctly?
There is also a possilbility that the entire building might exceed the area limitations of T503. I don't know for sure. If the entire project exceeds the allowable 9500 sq/ft for VB, they will have to sprinkler the whole place anyway to allow for the increased size of a mixed use occupancy. Right?
thanks folks
BS