Scenario: National Chain Fast Food Restaurant conducting a Level 2 Alteration via addition and reconfiguration of existing play area adding additional dining area.
Question 1: Does the addition and reconfiguration increasing the occupant load above 100 call for sprinklers now since it is an A-2?
Question 2: Does 3401.5 to 704.2.2 [2] trump the sprinklers because the area of work does not exceed 50% of the floor area?
We have one permitting now and just wondering if this is their out for sprinklers.
Question 1: Does the addition and reconfiguration increasing the occupant load above 100 call for sprinklers now since it is an A-2?
Question 2: Does 3401.5 to 704.2.2 [2] trump the sprinklers because the area of work does not exceed 50% of the floor area?