camk@fireratedsoluti
REGISTERED
I am with sales for Fire Shield. Recently we have had multiple projects across the country call us after failing inspection. The common industry practice of a "5 sided drywall" method requires EJ's and increased cost on labor and material. More inspectors are cracking down on this not being a viable solution. Has anyone ran into this issue on job sites? Our product is UL tested and listed and is the only system available that is approved for back-to-back configurations. Thank you for your input!