jar546
Forum Coordinator
Residential bathroom remodel, reconfiguration of space.
All wiring removed back to an existing junction box in the basement.
New wiring then installed from the existing junction box in the basement to include the GFCI, lights and fan.
The existing junction box that they wired from which previously did the same job except for no fan is part of a 15A circuit.
The main panel is in the basement which is unfinished.
Would your jurisdiction require the electrician to run a new 20A circuit for the GFCI receptacle in this instance?
All wiring removed back to an existing junction box in the basement.
New wiring then installed from the existing junction box in the basement to include the GFCI, lights and fan.
The existing junction box that they wired from which previously did the same job except for no fan is part of a 15A circuit.
The main panel is in the basement which is unfinished.
Would your jurisdiction require the electrician to run a new 20A circuit for the GFCI receptacle in this instance?