I have a boiler installation where the drain line from the T&P valve is running into a glycol tank for recirculation back into the heating system.
I have asked for something from the manufacturer or mechanical engineer to support this installation but have nothing yet.
Is this allowed?
I have asked for something from the manufacturer or mechanical engineer to support this installation but have nothing yet.
Is this allowed?