chris kennedy
ADMIN
Had it at the shop in the recycled wire rack.ICE said:Is there a reason that you use insulated as opposed to a bare conductor?
One comes from a 600A MDP and the other is a jumper to 2nd rod.Why are there two GEC?
40.Is that schedule 80 conduit?
Goes to phone board.What is the green bonding jumper for?
Temp for construction.And I see an armored cable, what's that for?