jar546
CBO
I'd like to share some building department permit fees just to see some of the differences around the world. Please feel free to share a few of yours. Some fees are established, set fees and many if not most are based on the cost of construction. Here are a few that I looked up. Please state location.
Established Fees:
Water Heater Replacement - $109 Danville, California
Furnace and AC Replacement - $186 Danville, California
In Ground Swimming Pool (new) - $325 Easton, Pennsylvania
Reinspection Fee - $109 Danville California
Based on Valuation:
$100,000 - $500,000 - $643.75 for the first $50,000 plus $7.00 for each additional $1,000, or fraction thereof, to and including $100,000 Danville, California
$100,000 - $500,000 - $1,585, plus $12 for each $1,000 over $100,000 Easton, Pennsylvania
One and two-family residential buildings:
(a) First $500.00 valuation of construction costs (total contract amount) MINIMUM FEE 100.00
(b) $501.00 and up (1.75% of the remaining total estimated valuation of construction costs; includes all plan 1.75% check fees and subpermit fees, except fire.) Fire permit fees are in addition to these fees. Boca Raton, Florida
Established Fees:
Water Heater Replacement - $109 Danville, California
Furnace and AC Replacement - $186 Danville, California
In Ground Swimming Pool (new) - $325 Easton, Pennsylvania
Reinspection Fee - $109 Danville California
Based on Valuation:
$100,000 - $500,000 - $643.75 for the first $50,000 plus $7.00 for each additional $1,000, or fraction thereof, to and including $100,000 Danville, California
$100,000 - $500,000 - $1,585, plus $12 for each $1,000 over $100,000 Easton, Pennsylvania
One and two-family residential buildings:
(a) First $500.00 valuation of construction costs (total contract amount) MINIMUM FEE 100.00
(b) $501.00 and up (1.75% of the remaining total estimated valuation of construction costs; includes all plan 1.75% check fees and subpermit fees, except fire.) Fire permit fees are in addition to these fees. Boca Raton, Florida