• Welcome to The Building Code Forum

    Your premier resource for building code knowledge.

    This forum remains free to the public thanks to the generous support of our Sawhorse Members and Corporate Sponsors. Their contributions help keep this community thriving and accessible.

    Want enhanced access to expert discussions and exclusive features? Learn more about the benefits here.

    Ready to upgrade? Log in and upgrade now.

Building Separation

Craig Gambill

REGISTERED
Joined
Aug 24, 2016
Messages
1
Location
Irvine, ca
I have a triplex building (R-2) Type VB non-rated, consisting of 2 townhouse and a carriage unit over the garage. I have a breezeway between the townhomes taht is 9' wide, going back to the carriage entry. My plan checker is telling me that since we are separating the units with 1hr partwalls, i will need to ahve 1 hour walls on the exterior and 20min. windows in the breezeway. does anyone have a code reference that I can use to eliminate the 1hr and 20 min windows?
 
Did the plan checker give you the sections or do you know the sections the plan checker is using to require the above items??


There are a few Calif people on here, so should help
 
A drawing would help or the code sections that the plan checker is using....If we don't know why the windows are supposed to be rated, an alternative is tough to prescribe...
 
I'm thinking that the breezeway is being considered part of the 'exit' due to travel distance from the carriage unit. An 'exit' is a protected path, hence the rating requirements. The breezeway is functionally an 'exit passageway' in this instance.
 
I'm having trouble with the use of 'party walls' in the OP. A 'party wall' is a common wall between buildings, so I don't see how there could be a breezeway between them (since 'them' is an 'it'...).
In addition 'party walls' shall have no openings, so windows cannot be located in party walls.
 
Back
Top