jar546
CBO
Left side is the line to the grease separator, right side is the house dwv which comes to a building trap.
The sewer authority has no written requirement for a whole building/house trap but the inspector in this town always makes them install one.
How would you handle this situation?
		
		
	
	
		 
	
	
		
			
		
		
	
				
			The sewer authority has no written requirement for a whole building/house trap but the inspector in this town always makes them install one.
How would you handle this situation?
 
	 
	 
 
		 
 
		 
 
		 
 
		 
 
		