Brig-design
REGISTERED
I have 3 cubicle clusters. Each cluster has, at least, 44" between them - those pathways leading South to main aisleways which lead to emergency exits. Those pathways (between the clusters) are 18'-9" in length. At the North head of the clusters, the pathway between the clusters and the 3 private offices above them, is 3'-1" (runs E/W). Although not preferrable, is it legal? No one needs to travel more than 75' to reach a main egress aisleway. I don't know how to attach a PDF or JPG of the layout. I say, 3' is perfectly legal. But I would like other opinions.
Thanks.
Thanks.