Can't count how many times I have seen a concrete foundation poured one day, the forms stripped and subfloor framing begin the next day. What about curing of the concrete? All I could find on the subject either residential or commercial is 2009 IBC Section 1905.11 Curing. The length of time, temperature and moisture conditions for curing of concrete shall be in accordance with ACI 318, Section 5.11. Is this something that I have been missing? Does anyone see to it that foundations are kept wet/covered for an adequate amount of time to cure? :wstupid