Mr. Inspector
SAWHORSE
I failed an inspection where they poured concrete when it was 27 and went down to 22 that night and they had no blankets or heaters to insulate it with. Temperature of forms and stone it was [poured on was also below freezing. How would this concrete be tested so I could approve it to build on.