mtlogcabin
SAWHORSE
Does anybody require this be filled out and if so why.
2010 NFPA 10.10 figure 24:10.10
We verify the pipe and thrust blocking of the installation prior to back fill, the flush test, hydro-static test and our public works operates the valves during the flush so we control that process. This was required by the FD many years ago when they did the inspections. I am just trying to understand the necessity of this redundant paperwork since our inspectors document what they observed during the flush and hydro-static test anyway. BTW
The FD never required permits for sprinkler installations so this form would be dropped into an address file and never looked at again.
I am just trying to understand the importance of this form and the requirement for the property owner to sign it.
2010 NFPA 10.10 figure 24:10.10
We verify the pipe and thrust blocking of the installation prior to back fill, the flush test, hydro-static test and our public works operates the valves during the flush so we control that process. This was required by the FD many years ago when they did the inspections. I am just trying to understand the necessity of this redundant paperwork since our inspectors document what they observed during the flush and hydro-static test anyway. BTW
The FD never required permits for sprinkler installations so this form would be dropped into an address file and never looked at again.
I am just trying to understand the importance of this form and the requirement for the property owner to sign it.