coping

ICE

MODERATOR
Staff member
Joined
Jun 23, 2011
Messages
13,823
Location
California
The plan is for a concrete cap on the raised bond beam. There is no detail on the plans. There's no connection to the bond beam. I have seen it done with a concrete deck overhanging the bond beam and in that case there is no connection to the bond beam.

30298458552_cf204f6e10_b.jpg

30328927271_cf221de3f7_b.jpg

29784513624_97b0650418_b.jpg
 

Attachments

  • 30328927271_cf221de3f7_b-1.jpg
    30328927271_cf221de3f7_b-1.jpg
    243.3 KB · Views: 1
Last edited:
& = &

Can you request detailed plans ?
Setback distance to the property line ?



& = &
 
It meets the setback requirement and I did ask for a detail from the engineer. i was filling in for another inspector so I won't know what happens.
 
The plan is for a concrete cap on the raised bond beam. There is no detail on the plans. There's no connection to the bond beam. I have seen it done with a concrete deck overhanging the bond beam and in that case there is no connection to the bond beam.








Ice,,,

How do you post pictures,, the steps to do it ?
 
Back