Section R502.2.2 gives you a alternate way for deck ledgers if you are not useing the bolt spacing table R502.2.2.1
This section says that the design must be to accepted engineering practice. I'm not sure what this means since I am not a practicing engineer. Does this mean it must be enginerred?
This section also says girders shall not be suppored on deck ledgers or band joists. Does this mean if you don't do the alternate deck ledger and follow table R502.2.2.1 you can support girders with the ledger and band joists?
R502.2.2.3 Tells you if not using table R502.2.2.1 you must use at least 2 hold down devices. It doe not say where they need to be or when you need more two or if you need any other bolts for the ledger. Is this when the engineering comes in?
on fig.502.2.2.3 of the hold down device it shows the subfoor on the interior joists nailed every 6". How do you check this on a exsiting house?
This section says that the design must be to accepted engineering practice. I'm not sure what this means since I am not a practicing engineer. Does this mean it must be enginerred?
This section also says girders shall not be suppored on deck ledgers or band joists. Does this mean if you don't do the alternate deck ledger and follow table R502.2.2.1 you can support girders with the ledger and band joists?
R502.2.2.3 Tells you if not using table R502.2.2.1 you must use at least 2 hold down devices. It doe not say where they need to be or when you need more two or if you need any other bolts for the ledger. Is this when the engineering comes in?
on fig.502.2.2.3 of the hold down device it shows the subfoor on the interior joists nailed every 6". How do you check this on a exsiting house?