Gabriel Gaul
REGISTERED
Long story short, I've been butting heads a lot recently with my local building enforcement officials. In my most recent permit application for a deck I'm getting ready to build, he came back that I needed a 12" thick slab for the landing my deck stairs will terminate on. I'm rebuilding a deck that was removed in the exact same footprint. It is above an existing concrete patio. Stairs are going to be a split landing and the final run of 5 feet will land on the existing patio. This is exactly the same as the old deck.
I'm trying to find in the building code where this is a requirement but failing hard.
Do I really need to rent a concrete saw and saw out a section of the old patio and re pour to make these people happy?
As of Jan 1 we moved to the 2018 Code. I went to all the code "changes" meetings and this was never addressed.
I'm trying to find in the building code where this is a requirement but failing hard.
Do I really need to rent a concrete saw and saw out a section of the old patio and re pour to make these people happy?
As of Jan 1 we moved to the 2018 Code. I went to all the code "changes" meetings and this was never addressed.