I have a request to use delayed egress systems on the exit discharge doors in a child day care facility for security reasons. Section 1008.1.8.6 of the 2006 IBC for delayed egress locks, permits their installation in all buildings equipped with an automatic sprinkler system or smoke and heat detection system, except group A, E, and H occupancies. The building I am reviewing is a non-sprinklered, Group E building.
If the RDP re-classifies the occupancy as an I-4 and installs the automatic sprinkler system, would they then be allowed to use delayed egress locks?
Is an I-4 occupancy that much different than an E occupancy when discussing a child day care use?
Occupant Load of 150+/- (not including the playground area)
Type of Construction V-B
7,200 SF
Group E
If the RDP re-classifies the occupancy as an I-4 and installs the automatic sprinkler system, would they then be allowed to use delayed egress locks?
Is an I-4 occupancy that much different than an E occupancy when discussing a child day care use?
Occupant Load of 150+/- (not including the playground area)
Type of Construction V-B
7,200 SF
Group E