As an architect, I have an increasing number of clients with relatively simple projects that want me to design the building, but have their own design-build contractors to do the mechanical, plumbing and electrical design as a deferred approval. I'm fine with this, but I have some building departments that say it is impossible to defer these approvals, especially where code-required energy calculations (such as California Title 24) relate the efficiency of the mechanical systems to the building envelope.
Does your jurisdiction allow MEP design to be a deferred approval? If so, great! How do you go about proving energy compliance with an architectural (life-safety only) plan check?
Does your jurisdiction allow MEP design to be a deferred approval? If so, great! How do you go about proving energy compliance with an architectural (life-safety only) plan check?