codeworks
REGISTERED
heres a doosie. we are going to logger heads with our poco because they are saying they want disconnects to be installled ahead of the meter cabinet to "keep thier guys safe" i've never heard of it. if they really want it, thats fine, but then they own it and should supply it disco) and install it( it's in their supply loop) we will still need one on the other side (load side of the meter ) for disconnect of services after the meter. any input, any one heard of this, seen it before ? i can't understand why if the poco is worried about guys pulling meters, they should pull the cutout on the pole