Dean Rich
REGISTERED
I'm adding some electrical to my garage and I have read and understand the rules of drilling holes in non load bearing and load bearing walls. While pulling away some drywall I ran into a large cluster of studs/engineered support post. There are 3 2*6 right next to each other with a 7 * 5.5 engineered support post and then another 2*6. All of those are together with no space. The engineered support post is nailed to the 2*6 on each side of it. The engineered support post supports three roof trusses. My plan is to drill three or four 3/4" holes right in the middle of the 2*6 and engineered support post. I want to make sure that drilling through this engineered beam is acceptable. Its the easiest route, but if I need to find a new route I'll work on a new plan.
My gut says I can't do this, but just wanted to verify.
I appreciate any insight you could provide around drill holes through this cluster of studs.
My gut says I can't do this, but just wanted to verify.
I appreciate any insight you could provide around drill holes through this cluster of studs.