FyrBldgGuy
Silver Member
- Joined
- Oct 19, 2009
- Messages
- 356
The big new push is to install Electric Vehicle Charging Stations in as many locations as possible. To cut down on the time it takes to charge a vehicle it is necessary to install a large capacitor or battery bank. So will the codes be written before or after the first accident? Will this be part of the Electrical Code or the Fire Code or both?