• Welcome to The Building Code Forum

    Your premier resource for building code knowledge.

    This forum remains free to the public thanks to the generous support of our Sawhorse Members and Corporate Sponsors. Their contributions help keep this community thriving and accessible.

    Want enhanced access to expert discussions and exclusive features? Learn more about the benefits here.

    Ready to upgrade? Log in and upgrade now.

Electrical plan reviewer

Who does your electrical plan reviews

  • Electrical inspector

    Votes: 3 33.3%
  • Combination Mech, Elec and/or plumbing inspector (any combination)

    Votes: 0 0.0%
  • General Plans examiner

    Votes: 3 33.3%
  • Third party

    Votes: 0 0.0%
  • Other, please explain

    Votes: 3 33.3%

  • Total voters
    9

rktect 1

SILVER MEMBER
Joined
Oct 20, 2009
Messages
1,165
Location
Illinois
So, I was trying to find out who typically does the commercial and residential electrical plan reviews in a city.

Figured I would add a poll.
 
The inspector checks residential on the fly unless it involves any equipment rated over 400 amps. Commercial will usually get a plan check. It may be only for energy but most commercial projects need a plan check. If a project is checked it will be done by an in-house electrical engineer ......we have a bunch of them and all solar, no matter the size is plan checked by an electrical engineer.
 
Last edited:
Washington State....State Dept of Labor and Industries has full jurisdiction over electrical. They however do not perform plan review.
 
Back
Top