VLADIMIR LEVIN
REGISTERED
Can someone clarify section 1011.7.3 BCNYS.
I have a metal stair with a utility closet underneath it.
I think the closet walls need to be 1 hour, and the underside of the stair needs to be 1 hour?
	
		
			
		
		
	
				
			I have a metal stair with a utility closet underneath it.
I think the closet walls need to be 1 hour, and the underside of the stair needs to be 1 hour?
 
	 
 
		 
 
		 
 
		 
 
		