BSSTG
Gold Member
Greetings,
Something I've wondered about a long time is about to happen in my jurisdiction. Existing unsprinklered restaurant is going to expand by adding a new section which will be a new kitchen. I don't know what is happening the old kitchen at this time. Existing occ load is over 100 already. Obviously the occupant load will increase at least minimally.
Should this place be sprinklered at this time. BTW, these same folks pulled a fast one on my predecessor. They built another brand new A-2 and somehow got away without sprinklers.
thanksabunch
BSSTG
Something I've wondered about a long time is about to happen in my jurisdiction. Existing unsprinklered restaurant is going to expand by adding a new section which will be a new kitchen. I don't know what is happening the old kitchen at this time. Existing occ load is over 100 already. Obviously the occupant load will increase at least minimally.
Should this place be sprinklered at this time. BTW, these same folks pulled a fast one on my predecessor. They built another brand new A-2 and somehow got away without sprinklers.
thanksabunch
BSSTG