Ryan Schultz
SAWHORSE
We're designing a full sprinklered 3 story Type VB R-2 Occupancy.
We're using wood trusses and tossing around an idea of exposing the floor trusses.
Per the exception at 711.2.4.3, the floor needs a 30min rating.
Do you feeling, that although we'd have to apply some type of intumescent paint for the trusses (to achieve the 30min rating) and a more augmented acoustical floor assemble above the substrate of the floor, it it would, at the very least, be a wash, cost-wise, relative to the standard approach of drywall and metal channel under the trusses and batt insulation in the cavities?
We're using wood trusses and tossing around an idea of exposing the floor trusses.
Per the exception at 711.2.4.3, the floor needs a 30min rating.
Do you feeling, that although we'd have to apply some type of intumescent paint for the trusses (to achieve the 30min rating) and a more augmented acoustical floor assemble above the substrate of the floor, it it would, at the very least, be a wash, cost-wise, relative to the standard approach of drywall and metal channel under the trusses and batt insulation in the cavities?