chris_needs_help
REGISTERED
I have a multi-story, Type I-B building. The concrete on metal deck floor is rated, but the exterior wall is not. The metal framing for the exterior wall starts and stops at the floor. The wall assembly has a finish, but the main assembly has continuous sheathing on the exterior and gypsum board on the interior that also starts and stops at the floor. I am having a hard time determining if the edge of the slab need some sort of firestop or draftstop between the edge of slab and the backside of the continuous sheathing (within the wall assembly). Is there a specific code requirement for this?