north star
MODERATOR
- Joined
- Oct 19, 2009
- Messages
- 4,596
~ & ~
I have a set of plans with a 4" horizontal drain to 4" horizontal drain
connection with a 45 degree wye fitting and then a 1/8th fitting farther
upstream.......Both of the 4" drain lines are for solids & liquids.......The
heel inlet of the 4" wye fitting connects to an existing 4" dry vent....The
term I am thinking of is "flat venting".
In looking at the proposed design of this connection wye fitting, I am
thinking that the solids entering the existing 4" drain line "could"
potentially block the dry vent......I have always been taught that these
types of "horizontal drain-to-horizontal drain fitting" connections
should have the wye fitting turned upward ( full vertical position ), so
that the drain line solids enter the downstream horizontal drain line
from the top rather than the side.
QUESTION # 1: Does any of this rambling make sense to ya'll ?
QUESTION # 2: Is there language in the `06, 09 or `12 IPC's, that
require the solids to enter from the top of the horizontal drain line
rather than from the side ?
QUESTION # 3: Haven't we had similar discussions on this Forum
before regarding "flat venting' ?
Thanks !
~ & ~
I have a set of plans with a 4" horizontal drain to 4" horizontal drain
connection with a 45 degree wye fitting and then a 1/8th fitting farther
upstream.......Both of the 4" drain lines are for solids & liquids.......The
heel inlet of the 4" wye fitting connects to an existing 4" dry vent....The
term I am thinking of is "flat venting".
In looking at the proposed design of this connection wye fitting, I am
thinking that the solids entering the existing 4" drain line "could"
potentially block the dry vent......I have always been taught that these
types of "horizontal drain-to-horizontal drain fitting" connections
should have the wye fitting turned upward ( full vertical position ), so
that the drain line solids enter the downstream horizontal drain line
from the top rather than the side.
QUESTION # 1: Does any of this rambling make sense to ya'll ?
QUESTION # 2: Is there language in the `06, 09 or `12 IPC's, that
require the solids to enter from the top of the horizontal drain line
rather than from the side ?
QUESTION # 3: Haven't we had similar discussions on this Forum
before regarding "flat venting' ?
Thanks !
~ & ~