rth
Bronze Member
adopted code = 2006 ICC IFC
Not used to people emailing about a product wanting to know if it is OK to install. No local or state ordinance requiring more than IFC for installation requirements. Business/building owner emails product wants to know if it will be OK to install to replace upright for drop ceiling. Area above drop ceiling is non-combustable.
Product =
Flexible sprinkler Connector - Optimal Supply
36" unbraided
I called the company trying to get information as to weather or not the product is UL and FM listed. Haven't got in touch with anyone yet.
If the product is OK with instalation require 200psi test?
Any other requirements right offhand?
Thank you.
Not used to people emailing about a product wanting to know if it is OK to install. No local or state ordinance requiring more than IFC for installation requirements. Business/building owner emails product wants to know if it will be OK to install to replace upright for drop ceiling. Area above drop ceiling is non-combustable.
Product =
Flexible sprinkler Connector - Optimal Supply
36" unbraided
I called the company trying to get information as to weather or not the product is UL and FM listed. Haven't got in touch with anyone yet.
If the product is OK with instalation require 200psi test?
Any other requirements right offhand?
Thank you.