• Welcome to The Building Code Forum

    Your premier resource for building code knowledge.

    This forum remains free to the public thanks to the generous support of our Sawhorse Members and Corporate Sponsors. Their contributions help keep this community thriving and accessible.

    Want enhanced access to expert discussions and exclusive features? Learn more about the benefits here.

    Ready to upgrade? Log in and upgrade now.

Floor Joists Confusion

El Ducci

REGISTERED
Joined
Dec 2, 2018
Messages
3
Location
Lancaster, PA
New floor joists over basement, 2x10 floor joists over 6x12 LVL center beam. Was expecting contractor to overlap the joists over LVL beam. When I arrived at job site, the joists have been butted end-to-end over LVL beam with a short piece of 2x10 "sistered" to one side of the abutment. Is this code compliant/will it pass inspection? Appreciative, ED
 
Lots of extra work. If done correctly it should be okay. Solid blocking should split on a tight seam.
 
  • Like
Reactions: JBI
Basic framing, IRC R502.6.1: Floor joist from opposite sides should over lap a minimum of 3-inches and be nailed together with a minimum of 3 nails. The other ends of the FJ can have a minimum of 1.5-inches of bearing on a sill plate.

If end butted, ICE stated, a splice block is required and can be metal or wood. If using wood it is most common to see a floor joist cut-off being used as the splice and is required on one side, both sides, up to you. Again as ICE indicated this is a more costly form of construction, more labor and material is being used to do it this way.

Beams supporting the FJ's require a minimum of 3-inches of end bearing support.
 
  • Like
Reactions: JBI
Back
Top