steveray
SAWHORSE
I remember we had a discussion about openings adjacent to a stairwell and when a guard would be required, but I don't know if we touched on the max opening (gap) in a floor system? Example....contractors spacing 20% moisture deck boards, then drying creates a 1/2" gap between them.....Compliant? Opinions, thoughts, code path or change?