Code says foundation shall extend below the frost line, which in NY is 42".
My drawings always indicate "...min 42" to top of footing", which places the footing below the frost line.
I had contractor question me and say they always do it to the bottom of the footing. And some Code officials say the same thing.
But 42" to the bottom of the footing would place the footing above the frost line.
Any one have any thoughts about this?
	
		
			
		
		
	
				