Yankee Chronicler
SAWHORSE
Frost depth for this entire state is set by the codes at 42 inches. If someone submits a set of drawings that shows the top of footings at 42 inches below grade, I'll approve it because it's better than code. But everything I see has the bottom of footing at 42 inches, which I regard as complying and which I have always approved.
You can always do better than what the code requires, but in the case of concrete that's buried beneath the building I consider it wasted money. Nobody ever sees it, nobody ever gets any benefit or enjoyment out of it -- so why do it?
You can always do better than what the code requires, but in the case of concrete that's buried beneath the building I consider it wasted money. Nobody ever sees it, nobody ever gets any benefit or enjoyment out of it -- so why do it?