mike-d
Registered User
Hello All,
I'm proposing to have an entire floor of open office (group b) occupancy, with a somewhat small portion of dining assembly (group A2 of 200 occupants) with 2 exits directly onto accessible public egress. the building is fully sprinklered (automatically) - do you think i should prepare to have a fire/smoke barrier strategy ready to go for the possible separation of the Dining Room and the Servery, Open Office? please take a look at the sketch in the attached PDF for better clarity.
thank you, and happy Friday.
-md
I'm proposing to have an entire floor of open office (group b) occupancy, with a somewhat small portion of dining assembly (group A2 of 200 occupants) with 2 exits directly onto accessible public egress. the building is fully sprinklered (automatically) - do you think i should prepare to have a fire/smoke barrier strategy ready to go for the possible separation of the Dining Room and the Servery, Open Office? please take a look at the sketch in the attached PDF for better clarity.
thank you, and happy Friday.
-md