Hey JP,jpranch said:ICE, I was not offended at all. I have a hide tougher than boot leather. Jobsaver got it. My point was that it comes with the job. Here we give them am or pm plus nothing. When pouring concrete we do our very best to accommodate the contractor. On occasion a contractor will need an inspection right away and we do our best to get there as long as the contractor isn't calling for an emergency every day, week, or month. It comes with the job.
I hear you. I have been out as the result of a car wreck for a week so far. Well last Friday I got a call from an Edison planner that wanted to energize a transformer to feed a gas station. The contractor was a jerk. The same workman did every trade. They had to do 90% of the copper plumbing twice. They had no clue what series rating is. They were never ready for inspection and forgot to request more often than not. They installed wrong Benjamen panels and wondered why they were all labeled B. They used left over weep screed for t-bar struts. There is more but you get the idea. All the while, the business is up and running.
Well they were ready to do a cut-over after they installed new, series rated, Cutler Hammer panels that weren't all labeled B. I told the contr. to pull the meter at 4:00 am, get his work done and I would meet Edison there at 8:00 am. On Monday I drove the 26 miles and got there to find that they shut down at 7:00 and had 3 hrs. work to do. Short handed to boot. Edison was only going to stay just so long and when they got done removing the old drop they wanted to stick the transformer and leave, so they did. There I am with my thumb up my.. for 3 hrs. They got it done and I stood way back when they hit the switch. Everybody was all smiles and to them it was another typical day. I went home.
Last edited by a moderator: