This may be a dumb question as I do not have a lot of experience with high rise buildings. How is Section 403.2.4 of the 2012 IBC to be read? Is it that SFRM is required for all high rise buildings OR is it to be read that when SFRM is used, it must meet the bonding requirements noted in the Table?