2009 IFC Section 405.2 Group I requires drills quarterly on each shift with employees participating.
In a 7 story high-rise I-2 - if an initiating device is activated notification devices are activated on three floors (the fire floor, and floors above, and below).
In an alarm the whole building does not particiate, only the three floors.
The drills are conducted so all shifts participate quarterly.
The drill floors are rotated.
Does a drill have to include "ALL" the employees in the whole building per quarter per shift; or is just the employees on the three floors adequate to meet Code? The Commentary was no help.
In a 7 story high-rise I-2 - if an initiating device is activated notification devices are activated on three floors (the fire floor, and floors above, and below).
In an alarm the whole building does not particiate, only the three floors.
The drills are conducted so all shifts participate quarterly.
The drill floors are rotated.
Does a drill have to include "ALL" the employees in the whole building per quarter per shift; or is just the employees on the three floors adequate to meet Code? The Commentary was no help.