Hey Everyone,
I recently submitted large house for a permit (over 600m2 building area) The plans examiner noted that because the building area exceeds 600m2 it falls outside of part 9 and will fall under part 3 , he then noted I will need a firewall to keep it as a part 9 building.
All our drawings have been reviewed and stamped by a professional engineer.
I have submitted many applications in excess of the 600m2 and not been asked to put in a fire wall.
Question why cant it be a part 3 building?
I am registered and qualified with 'house and 'small buildings'
I recently submitted large house for a permit (over 600m2 building area) The plans examiner noted that because the building area exceeds 600m2 it falls outside of part 9 and will fall under part 3 , he then noted I will need a firewall to keep it as a part 9 building.
All our drawings have been reviewed and stamped by a professional engineer.
I have submitted many applications in excess of the 600m2 and not been asked to put in a fire wall.
Question why cant it be a part 3 building?
I am registered and qualified with 'house and 'small buildings'