Code
REGISTERED
- Joined
- Mar 24, 2011
- Messages
- 28
We have an applicant that is looking to take an existing building and convert it into a shooting range. I'm thinking engineer/architect designing the barriers, some mechanical ventilation, but pretty much shooting from the hip (pun intended). I found a standard from the D.O.E., but without having a standard adopted, not sure which to use. Thinking about using the occupant loading of a bowling alley for the range it self. Anybody run into this?
http://energy.gov/sites/prod/files/2013/05/f1/Range_Design_Criteria.pdf
http://energy.gov/sites/prod/files/2013/05/f1/Range_Design_Criteria.pdf