Darren Emery
REGISTERED
We have a foundation design that shows 3 #5's in the top and bottom of a trench style foundation. No stirrups shown on the plans, therefore no obvious way to hold the top bars in place. Would you allow those top bars to be wet set during the pour?
Why or why not? Code ref?
Why or why not? Code ref?