• Welcome to The Building Code Forum

    Your premier resource for building code knowledge.

    This forum remains free to the public thanks to the generous support of our Sawhorse Members and Corporate Sponsors. Their contributions help keep this community thriving and accessible.

    Want enhanced access to expert discussions and exclusive features? Learn more about the benefits here.

    Ready to upgrade? Log in and upgrade now.

It's A Cluster$%#@ But We Have A Handle On It

jar546

CBO
Joined
Oct 16, 2009
Messages
13,320
Location
Not where I really want to be
Owner in a high-rise condo says the contractor installed a kitchen hood and covered it up before it was inspected. GC in charge of job says they did not install a range hood. The GC's contract says otherwise. GC says the owner hired someone else to do that, but the GC admits covering up the work. There was no mechanical inspection to determine if the duct was installed properly and connected to the high-rise stack. Owner and GC are arguing over money. We created a code case, and the owner had to hire another contractor to open up the soffit and wall so we could inspect it. This is what was found.
6959145.jpg6959146.jpg6959147.jpg6960040.jpg6960041.jpg
 
Back
Top