• Welcome to The Building Code Forum

    Your premier resource for building code knowledge.

    This forum remains free to the public thanks to the generous support of our Sawhorse Members and Corporate Sponsors. Their contributions help keep this community thriving and accessible.

    Want enhanced access to expert discussions and exclusive features? Learn more about the benefits here.

    Ready to upgrade? Log in and upgrade now.

Just an interesting pic...

Darren Emery

REGISTERED
Joined
Oct 20, 2009
Messages
510
Location
Manhattan, Ks
The pump truck operator learned a good lesson - don't place the outrigger this close to an open trench. 8" wide trench was down to 3" by the time I got there. They did NOT pour this section!

View attachment 1405

View attachment 1406

View attachment 1405

View attachment 1406

/monthly_2010_10/572953de04c0f_Outriggertooclosetotrench2.jpg.b99d3bb3bac91fc5853b414ce4a14539.jpg

/monthly_2010_10/572953de07231_Outriggertooclosetotrench1.jpg.a54423fcfa8af023288a98d824b7e9d5.jpg
 
Just out of curiosity, what are they placing concrete for?

Honest mistake. I wouldn't have thought that would have happened!
 
I'll have to try to see if I can find the picture, but on a job where I was testing the concrete I sampled the second truck, I had no more than taken my sample and moved my wheelbarrow about 20 feet away from where the pump truck and the mixer were when I heard a huge bang and the ground shook. I turned around to see the *** end of the pump truck up in the air. One of the front outriggers had punched through the asphalt and dropped down about 3 feet, thus throwing the entire weight ratio out of whack and the rear of the pump up in the air. Had it happened 20 seconds earlier I would have been right in the middle of getting my sample as the mixer was dumping into the pump. Just wasn't my time to meet my maker - I'll have to look for that picture.
 
Back
Top