jar546
Forum Coordinator
This is a SFR undergoing a level 2 renovation with an existing 150A service.
This is what it looks like when the architect tries to manipulate the numbers to make it appear as though the load calculation works when, in fact, it is not even close. This includes bogus numbers for the range, incorrect numbers and circuits for the tankless electric water heater, manipulated numbers for kitchen circuits, laundry, etc. Also, take note of how he labels the 240V as AMPS. The electrician would have done a much better job.
This is what it looks like when the architect tries to manipulate the numbers to make it appear as though the load calculation works when, in fact, it is not even close. This includes bogus numbers for the range, incorrect numbers and circuits for the tankless electric water heater, manipulated numbers for kitchen circuits, laundry, etc. Also, take note of how he labels the 240V as AMPS. The electrician would have done a much better job.