Commercial project, several MC cables enter a 2" NM conduit from the top of the panel. The 2" conduit is cut off at ceiling level with the MC entering the conduit. 2-3" inside the conduit the MC jacket is removed with the wires continuing into the panel. I cannot find where this would not be allowed. I would prefer the MC to connect directly to the top of the panel with connectors or be transfered to rigid conduit at the ceiling level. This appears to be a cost saving install.