Ryan Schultz
SAWHORSE
I have a PEMB that has an occupancy of A3 in a IBC 2009 jurisdiction.
The steel structure is supported on concrete piers.
Between these piers will be a frost wall with fill on both side. Slab on grade.
Question, what's the minimum thickness that this frost wall needs to be? I found minimum thicknesses for foundation walls in table 1807.1.6.2, but this frost wall is really not a foundation, per say, if defined as an element that bears the building load.
Thanks Much, Ryan
The steel structure is supported on concrete piers.
Between these piers will be a frost wall with fill on both side. Slab on grade.
Question, what's the minimum thickness that this frost wall needs to be? I found minimum thicknesses for foundation walls in table 1807.1.6.2, but this frost wall is really not a foundation, per say, if defined as an element that bears the building load.
Thanks Much, Ryan