• Welcome to The Building Code Forum

    Your premier resource for building code knowledge.

    This forum remains free to the public thanks to the generous support of our Sawhorse Members and Corporate Sponsors. Their contributions help keep this community thriving and accessible.

    Want enhanced access to expert discussions and exclusive features? Learn more about the benefits here.

    Ready to upgrade? Log in and upgrade now.

NEC 240.12 Electrical System Coordination

jar546

CBO
Joined
Oct 16, 2009
Messages
12,996
Location
Not where I really want to be
240.12 Electrical System Coordination.
Where an orderly shutdown is required to minimize the hazard(s) to personnel and equipment, a system of coordination based on the following two conditions shall be permitted:
  • (1) Coordinated short-circuit protection
  • (2) Overload indication based on monitoring systems or devices
Informational Note:
The monitoring system may cause the condition to go to alarm, allowing corrective action or an orderly shutdown, thereby minimizing personnel hazard and equipment damage.

Here are some questions about the above:

1) In what applications is this typically seen?

2) How do you verify this during plan review?