Robert
REGISTERED
Companion thread to "Stories above grade plane".
Tennis club rebuild (CA). The ground floor is locker rooms with an OL of 50 sq./ft/per person and the gym is upstairs. However, the club has outdoor swim lessons of 6 kids at a time, plus parents viewing and there are 6 full size outdoor tennis courts. Conceivably these can all be going on at the same time. Should I add all of these individuals & spaces up to get the correct OL count of the ground floor locker rooms? Before the fire, the ground floor had one exit because of OL <50 and CPOT <75' (unsprinklered). Thanks.
Tennis club rebuild (CA). The ground floor is locker rooms with an OL of 50 sq./ft/per person and the gym is upstairs. However, the club has outdoor swim lessons of 6 kids at a time, plus parents viewing and there are 6 full size outdoor tennis courts. Conceivably these can all be going on at the same time. Should I add all of these individuals & spaces up to get the correct OL count of the ground floor locker rooms? Before the fire, the ground floor had one exit because of OL <50 and CPOT <75' (unsprinklered). Thanks.